Quality Beginner

Completing an inspection

How to complete a quality inspection in Brytebuild — recording pass/reject quantities, filling in the checklist, and submitting to release quarantined stock.

1 min read All roles Updated August 2026

Getting started

Overview

1 minute

Go to Quality → Inspections. In the Awaiting QC queue, find the item you want to inspect and click Inspect now. What opens next depends on whether the item has a QC schedule:

Scenario What opens Section
Item has a QC schedule (WO-triggered)The QC Work Order view — a Works Order Details page with the inspection broken into lots. Use the Inspection Worksheet to record results per batch.Sections 02–04
Item has no QC schedule (ad-hoc, PO receipt)The simplified inspection form — a single-page form to record QTY PASSED / QTY REJECTED, fill the checklist and submit.Section 05

Either path ends with clicking Submit & release stock, which releases the quarantined quantity and writes the result to the Inspection Log.

Save your progress at any time

Both paths let you save progress and return later. The draft is restored automatically when you reopen the inspection — no data is lost.

Section 02

The QC Work Order view

2 minutes

For items with a QC schedule, clicking Inspect now opens the Works Order Details page. A blue QC card at the top identifies this as a QC work order and shows its status and target.

QUALITY QC WORK ORDER
QC (ad-hoc): Incoming Goods — M8 Hex Bolts QC

Scheduled inspection — completing it releases the target's quarantined stock via the Quality accept/release flow.

Status

In Progress

Target

Purchase Order

Est Hrs

2

Inspection Details

Inspection Target

Purchase Order PO-2026-0033 ↗

Inspection Plan

Work Centre

Estimated Hours

2
Schedule & Assignment

Scheduled Date

2026-07-20

Assigned To

Syed Naqeeb ul Haq

Current Status

In Progress

How to complete this QC WO: Use "Inspect / Accept target" below to open the inspection grid. Record pass/reject quantities for each lot and submit — this releases quarantined stock and automatically marks this work order as completed.

Complete this QC work order by inspecting and accepting the target.

Open target Inspect / Accept target
Item What it does
Open targetOpens the linked Purchase Order or Works Order in a new tab — useful for cross-referencing the delivery paperwork or production record without leaving the inspection.
Inspect / Accept targetOpens the full inspection form where you record pass/reject quantities and fill the checklist. This is the primary action to complete the inspection.

Section 03

Inspection Lots

2 minutes

Below the action buttons sits the Inspection Lots table. Each row represents one product lot to be inspected. The work order completes only when every lot is resolved. The row's action buttons change as the lot progresses through its states.

Lot status progression

Inspection Lots1

One lot per product — each carries its own plan and completes independently. The order completes when every lot is resolved.

ProductStatusPlanIn LotRecordedPass / RejectHoursSched. StartSched. EndActions
M8 Hex Bolts — Grade 8.8
#HB-0083
Awaiting PlanIncoming Goods — M8 Hex Bolts · v1 5000
500 remaining
✓0 / ✗0Assign

Awaiting Plan — select the correct inspection plan from the dropdown, then click Assign.

Inspection Lots1

One lot per product — each carries its own plan and completes independently. The order completes when every lot is resolved.

ProductStatusPlanIn LotRecordedPass / RejectHoursSched. StartSched. EndActions
M8 Hex Bolts — Grade 8.8
#HB-0083
ReadyIncoming Goods — M8 Hex Bolts v15000
500 remaining
✓0 / ✗02▷ Start▯ Record

Ready — plan is assigned. Click Record to open the Inspection Worksheet and begin recording results.

Inspection Lots1

One lot per product — each carries its own plan and completes independently. The order completes when every lot is resolved.

ProductStatusPlanIn LotRecordedPass / RejectHoursSched. StartSched. EndActions
M8 Hex Bolts — Grade 8.8
#HB-0083
In ProgressIncoming Goods — M8 Hex Bolts v15000
500 remaining
✓0 / ✗02started 28 Jul, 10:46 am▷ Continue≡ Log ▾

In Progress — recording has begun. Click Continue to reopen the Inspection Worksheet. Use Log to view draft entries.

Column What it shows
ProductThe product name and part number being inspected in this lot.
StatusAwaiting Plan (amber) — plan not yet assigned. Ready (green) — plan assigned, ready to record. In Progress (blue) — recording has started. Complete (grey) — submitted.
PlanThe inspection plan for this lot. In Awaiting Plan state this is a dropdown — select the plan and click Assign.
In LotThe quantity in this lot — e.g. the number of units received on this PO line.
RecordedHow many units have been recorded so far, and the outstanding remainder (amber badge).
Pass / RejectRunning totals of passed (✓, green) and rejected (✗, red) quantities across all worksheet rows entered so far.
HoursEstimated inspection hours from the plan, shown once a plan is assigned.
Scheduled StartThe started timestamp, populated when you click Start or Record.
Scheduled EndThe scheduled end date from the plan.

Section 04

The Inspection Worksheet

3 minutes

Clicking Record (or Continue if already started) opens the Inspection Worksheet — the main data-entry screen for recording pass/reject quantities and filling in the checklist.

QUALITY INSPECTION WORKSHEET

M8 Hex Bolts — Grade 8.8

Record passed and rejected quantities per row. Save to pause and resume later, or Submit & release stock to commit.

Received Qty

500

OS Qty

500

Checks

3

Lot Information

Product

M8 Hex Bolts — Grade 8.8

Received Qty

500

Outstanding

500

500 units outstanding — fill in rows below then submit to release.
Inspection Checks — recorded once for the entire lot

Dimensional check — M8 shank Ø

7.85–8.00 mm

Required
Pass

Surface finish — no burrs or pitting

Visual

Required
Pass

Batch certificate number

BCH-2026-0033-A

Pass
Inspection Worksheet

Add one row per inspection session or batch. Save to pause, Submit to release stock.

Passed Rejected Reason Disposition Started Finished Notes Checked By
500
0
Quarantine
28/07/2026 10:46
28/07/2026 11:20
All bolts within Ø tolerance. Batch cert on file.
Syed Naqeeb
0
0
Quarantine
dd/mm/yyyy
dd/mm/yyyy
Notes...
you
Add row
Worksheet column What to enter
PassedThe number of units that passed inspection in this row/session.
RejectedThe number of units that failed. If any units are rejected, you must select a Reason.
ReasonThe reject reason — select from the dropdown. Required when Rejected > 0.
DispositionWhat happens to rejected units — e.g. Quarantine, Scrap, Return to Supplier, Rework. Defaults to Quarantine.
Started / FinishedThe date and time this inspection session started and ended. Auto-populated when you click Start, but editable.
NotesFree-text notes for this row — e.g. "Batch cert on file", "Measured with Vernier caliper #VC-04".
Checked ByThe inspector who carried out this session. Defaults to you. Can be changed to another user from the dropdown.
Outstanding quantity must reach zero

The Submit & release stock button activates when the total of all Passed + Rejected rows equals the lot's outstanding quantity. The amber badge shows how many units remain. Add more rows if you inspected in multiple batches.

Section 05

The simplified inspection form

2 minutes

For items without a QC schedule — such as ad-hoc inspections or Purchase Order receipt items — clicking Inspect now opens the simplified form. Enter quantities, fill the checklist and submit on one page.

Inspection — Goods In: QC (ad-hoc): Incoming Goods — M8 Hex Bolts

Record pass/reject quantities and checklist results, then submit to release stock

Back

Stock is quarantined until you submit this inspection. Enter quantities inspected, flag any rejects with a reason and disposition, fill in the checklist, then click Submit & Release Stock.

1 product to inspect  ·  1 recorded
M8 Hex Bolts — Grade 8.8 #HB-0083
500 ea quarantined

Qty Passed

500

Qty Rejected

0

100% passed

Disposition

Quarantine

Activity

Inspection

Started

28/07/2026, 10:46

Finished

28/07/2026, 11:20

Notes

All bolts within Ø tolerance. Batch cert number BCH-2026-0033-A recorded below.
Hide checklist ▲
Checklist Criteria — 3 Items
Criterion Type Pass Recorded Value Notes
Dimensional check — M8 shank Ø Must Pass Measurement Pass 7.93 mm Within spec
Surface finish — no burrs or pitting Must Pass Visual Pass Clean finish
Batch certificate number Text Pass BCH-2026-0033-A

Final step

Submitting and releasing stock

1 minute

When all quantities are accounted for and the checklist is complete, click Submit & release stock. This is the final action — it cannot be undone.

Quarantined stock is released

Passed quantities move from quarantine into available stock. Rejected quantities are held, scrapped or returned to supplier depending on the Disposition you set.

Inspection Log entry is created

A completed inspection record appears in the Inspection Log with the result (Pass / Partial / Fail), inspector, date, quantities and a link to the full record.

NCR raised automatically (if any rejects)

If any units were rejected, Brytebuild automatically creates a Non-Conformance Report (NCR). The NCR reference appears in the Inspection Log row.

QC Work Order marked complete (WO path only)

If you were working through the QC Work Order view, the work order is automatically closed once every lot is submitted.

Result What happens to stock NCR raised?
PassAll inspected quantity released into available stock.No
PartialPassed quantity released. Rejected quantity held/scrapped/returned per Disposition.Yes — for the rejected quantity
FailAll quantity held/scrapped/returned per Disposition. Nothing released to stock.Yes — for the full quantity
Not ready to submit yet?

Use Save draft (Worksheet) or Save progress (simplified form) to pause and resume later. The outstanding badge shows how many units still need to be accounted for before Submit becomes available.

What to do next