Quality Intermediate

Management Review

ISO 9001 §9.3 — schedule and conduct management reviews. Covers the review list, scheduling form, the review record, live §9.3.2 input panel (nonconformities, CAPA, audits, inspection rates, suppliers, prior actions), editing narrative inputs (§9.3.2b–f), output actions categorised as Improvement opportunity, QMS change or Resource need (§9.3.3), and completing a review to freeze QMS data as evidence.

1 min read Top Management, Quality Manager Updated August 2026

Section 01

What is Management Review?

2 minutes

Management Review in Brytebuild implements ISO 9001 §9.3 — the formal scheduled review by top management of the quality management system's continuing suitability, adequacy and effectiveness. Brytebuild eliminates re-keying of data by pulling the §9.3.2 input figures (nonconformances, CAPA, audits, inspection rates, suppliers) live from the QMS for the review period.

  • Each review is scoped to a period (e.g. H1 2026: 1 Jan – 30 Jun 2026) — the system aggregates QMS activity within that window
  • §9.3.2 inputs are live data — not re-keyed — and are frozen as evidence when the review is marked Complete
  • Narrative inputs (changes in context, customer satisfaction, objectives, resources, risks, OFIs) are entered in the Edit view
  • Outputs (§9.3.3) are decisions and actions — classified as Improvement opportunity, QMS change, or Resource need
  • Reviews move through two statuses: DraftComplete
  • Prior open actions from previous reviews are tracked automatically (§9.3.2a)
Set the period carefully

The period you set drives which QMS activity the §9.3.2 inputs aggregate. Leave Period — From blank to aggregate everything to date. Pick a period that actually contains the activity you want to review — the nonconformities, corrective actions, audits and inspections inside that window are what the input panel reports.

Section 02

The review list

1 minute

Navigate to Quality → Management Review to view all management reviews. Each row shows the review number, title, review date, period covered, who chaired it, current status and a View action.

Navigate toQualityManagement Review
PrintDownload ExcelSearch records…
NumberTitleReview DatePeriod CoveredChaired ByStatusActions
MR-2026-0001H1 2026 management review29 Jul 20261 Jan 2026 – 30 Jun 2026Syed Naqeeb ul HaqDraftView
MR-2025-0002H2 2025 management review15 Jan 20261 Jul 2025 – 31 Dec 2025Syed Naqeeb ul HaqCompleteView
Show 10 ▾ · Showing 1–2 of 2
«
1
»
Column What it shows
NumberAuto-assigned reference — e.g. MR-2026-0001. Immutable.
TitleThe review title — e.g. H1 2026 management review.
Review DateThe date the review meeting was held.
Period CoveredThe from–to window used to aggregate §9.3.2 inputs. "All time" if no period was set.
Chaired ByThe top management member who chaired the review.
Status● Draft — review in progress, data live. ● Complete — review closed, data frozen as evidence.

Section 03

Scheduling a review

2 minutes

Click + Schedule review (top-right) to open the scheduling form. Enter the title, review date, period, chair and attendees. Click Schedule review to create it at Draft status — the §9.3.2 input panel populates immediately from live QMS data.

Navigate toQualityManagement Review+ Schedule review

Schedule a Management Review

The period you set drives which QMS activity the §9.3.2 inputs aggregate

H1 2026 management review
dd / mm / yyyy
01 / 01 / 2026

Leave blank to aggregate everything to date

30 / 06 / 2026
— select —
names / roles present
Pick a period that actually contains the activity you want to review — the nonconformities, corrective actions, audits and inspections inside that window are what the §9.3.2 input panel reports.
Field Required What to enter
TitleRequiredA descriptive name — e.g. H1 2026 management review, Annual QMS review 2026.
Review DateOptionalThe date of the review meeting — e.g. 29 Jul 2026.
Period Covered — FromOptionalStart of the period whose QMS data should be aggregated. Leave blank to include all data from the beginning.
Period Covered — ToOptionalEnd of the review period. Leave blank to aggregate everything up to today.
Chaired ByOptionalTop management member chairing the review — e.g. Syed Naqeeb ul Haq.
AttendeesOptionalNames and roles of everyone present — e.g. Quality Manager, Production Manager, Managing Director.

Section 04

The review record

2 minutes

Click View on any row to open the full review record. It has four sections: Review Details, Review Inputs — Pulled from the QMS (§9.3.2), Review Inputs — Narrative, and Outputs — Decisions & Actions (§9.3.3). The header badges show STATUS and total ACTIONS count.

Review Details

Review Date

29 Jul 2026

Period Covered

1 Jan 2026 – 30 Jun 2026

Chaired By

Syed Naqeeb ul Haq

Attendees

Quality Manager, Production Manager, Managing Director

Section 05

§9.3.2 inputs — pulled from the QMS

2 minutes

The Review Inputs — Pulled from the QMS panel shows live figures for the review period. Nothing is re-keyed — Brytebuild reads the data directly from NCRs, CAPA, Audits, Inspections and Purchasing within the period you set. When the review is marked Complete these figures are frozen as evidence.

Review Inputs — Pulled from the QMS (§9.3.2)

Live figures for the period — nothing re-keyed

Nonconformities

8

8 open · 0 closed

Corrective Actions

4

2 open

Audits Conducted

1

1 findings · 1 open NC

Inspection Pass Rate

66.7%

18 inspections

Suppliers Approved

52

0 suspended · 2 unapproved

Prior Actions Open

0

from previous reviews (§9.3.2a)

Input card ISO clause What it shows
Nonconformities§9.3.2c.3Total NCRs in the period — split by open and closed. Amber when open NCs exist.
Corrective Actions§9.3.2c.3Total CAPA actions linked to the period — split by open and closed.
Audits Conducted§9.3.2c.5Audits completed in the period — count of findings and open nonconformity findings. Amber when open NCs exist.
Inspection Pass Rate§9.3.2c.1Percentage of inspections passed in the period — with total inspection count.
Suppliers Approved§9.3.2c.4Total active approved suppliers — with suspended and unapproved counts.
Prior Actions Open§9.3.2aOutput actions from previous management reviews that are still open — carried forward as required by §9.3.2a.

Review Inputs — Narrative

Changes in Context (§9.3.2b)

New regulatory requirements for fastener torque documentation under UK MHSR 2026 — requires inspector sign-off at goods-in stage for safety-critical batches.

Customer Satisfaction & Feedback (§9.3.2c.1)

Reef Zlements reported 2 delivery delays in Q1 due to late goods-in inspections. RSA Customz satisfaction score 4.2/5 — no quality complaints raised.

Quality Objectives (§9.3.2c.2)

Goods-in pass rate target 90% — actual 66.7%. Corrective action raised (CAPA-2026-0003). Supplier on-time delivery target 95% — actual 88%.

Adequacy of Resources (§9.3.2d)

Second Quality Lab technician position approved — start date Sep 2026. Vernier caliper EQ-2026-0001 recalibrated Jul 2026. Calibration schedule now current.

Risks & Opportunities (§9.3.2e)

Single-source risk on M8 Hex Bolts (Steelco Fasteners Ltd) remains open — second supplier evaluation in progress. Opportunity: digitise goods-in sign-off workflow (see OFI AF-2026-0002).

Opportunities for Improvement (§9.3.2f)

Digital goods-in sign-off workflow could eliminate paper documentation gaps identified in AUD-2026-0001 and reduce NCR rate from 8 to <3 per half-year.

Narrative input ISO clause What to record
Changes in Context§9.3.2bExternal and internal issues that affect the QMS — regulatory changes, market shifts, new customer requirements, organisational changes.
Customer Satisfaction & Feedback§9.3.2c.1Complaints, survey results, delivery feedback and satisfaction scores from customers including Reef Zlements and RSA Customz.
Quality Objectives§9.3.2c.2Progress against measurable objectives — actual vs target for pass rates, on-time delivery, CAPA closure time, etc.
Adequacy of Resources§9.3.2dPeople, equipment, competence and infrastructure — whether current resources are sufficient and what changes are needed.
Risks & Opportunities§9.3.2eEffectiveness of actions taken to address risks and opportunities identified in clause 6.1.
Opportunities for Improvement§9.3.2fImprovement opportunities identified across the period — link to OFI findings from audits and inspections where relevant.

Section 06

Editing a review

2 minutes

Click Edit review from the footer to open the edit view. The edit view is different from the schedule form — it shows the live QMS input panel and exposes all six narrative textarea fields for writing up the review discussion. The outputs section also appears below for managing actions during the edit session.

Edit is different from Schedule

The Schedule form (used to create a new review) only captures the header fields. The Edit view provides the full working form — narrative fields, access to the live QMS input panel, and the outputs section. All narrative work happens in Edit, not Schedule.

Review Inputs — Narrative

H1 2026 management review
29 / 07 / 2026
01 / 01 / 2026

Drives which activity the §9.3.2 files aggregate

30 / 06 / 2026
Syed Naqeeb ul Haq
Quality Manager, Production Manager, Managing Director
New regulatory requirements for fastener torque documentation under UK MHSR 2026 — requires inspector sign-off at goods-in stage for safety-critical batches.
Reef Zlements reported 2 delivery delays in Q1 due to late goods-in inspections. RSA Customz satisfaction score 4.2/5 — no quality complaints raised.
Goods-in pass rate target 90% — actual 66.7%. Corrective action raised (CAPA-2026-0003). Supplier on-time delivery target 95% — actual 88%.
Second Quality Lab technician position approved — start date Sep 2026. Vernier caliper EQ-2026-0001 recalibrated Jul 2026.
Single-source risk on M8 Hex Bolts (Steelco Fasteners Ltd) remains open — second supplier evaluation in progress. Opportunity: digitise goods-in sign-off workflow.
Digital goods-in sign-off workflow could eliminate paper documentation gaps identified in AUD-2026-0001 and reduce NCR rate from 8 to <3 per half-year.

Section 07

Outputs — decisions & actions (§9.3.3)

2 minutes

The Outputs section records the decisions and actions that arise from the management review discussion — as required by §9.3.3. Each output action is classified into one of three categories. Click + Add action to record each decision.

Outputs — Decisions & Actions (3) (§9.3.3)

Decisions on improvement, QMS change and resource need

Add action
Improvement opportunity

Implement digital sign-off workflow for goods-in inspection records to eliminate paper-based documentation gaps and reduce NCR rate. Target: live by Q4 2026.

Open
QMS change

Update QP-GI-001 Goods-in inspection procedure to mandate inspector signature on all delivery notes — not just safety-critical batches. Effective from 1 Sep 2026.

Open
Resource need

Second Quality Lab technician approved and hired — commence 1 Sep 2026. Address inspection throughput bottleneck and support calibration programme.

Done

Output action categories

Improvement opportunity

A decision to pursue an improvement to the QMS, a process or a product — e.g. digitising a manual process, improving inspection coverage, reducing NCR rate.

QMS change

A decision to change a QMS document, procedure or policy — e.g. updating a procedure to reflect new requirements, revising quality objectives, adding a new process step.

Resource need

A decision to provide resources — e.g. approving a new hire, purchasing calibration equipment, funding training, upgrading infrastructure or tooling.

Open actions carry forward

Output actions left open when the review is completed appear in the Prior Actions Open (§9.3.2a) KPI card on the next management review. This ensures continuity and traceability across review cycles.

Section 08

Completing a review

1 minute

When the review meeting is finished, all narrative fields are filled and actions recorded, click Complete review from the footer. This freezes the §9.3.2 input figures as evidence — they are no longer live — and sets the status to Complete. A completed review cannot be edited.

Footer button Available when What it does
Go BackAlwaysReturns to the review list without changes.
DeleteDraft onlyPermanently removes the review and all its outputs.
Edit reviewDraft onlyOpens the edit view — fill in narrative fields, adjust header fields, manage output actions.
Complete reviewDraft onlyFreezes the §9.3.2 input data, sets status to Complete, prevents further editing. Action is irreversible.
Completing is permanent

Once Complete review is clicked the §9.3.2 input figures are frozen — any NCRs, CAPAs or inspections added after this point will not affect the review record. The narrative fields and outputs also become read-only. If you need to correct a completed review, contact your Quality Manager.

What's next