Quality Intermediate

Documents

ISO 7.5 — how to create controlled documents, add versioned revisions, publish revisions (stamping the effective date and obsoleting the prior version), manage Read & Understood acknowledgements by audience group, and understand the full revision lifecycle (Draft → In review → Published → Obsolete).

1 min read Quality Manager, All staff Updated August 2026

Section 01

What is Document Control?

2 minutes

Document Control in Brytebuild is the ISO 7.5 compliant system for maintaining controlled, versioned documents across your quality management system. It separates the document header (the permanent record) from the revisions (the versioned content) so that every change is tracked, every published version is timestamped, and every superseded version is automatically obsoleted.

  • Documents have a permanent number (e.g. DOC-2026-0001) that never changes — the number is immutable
  • Content lives in numbered revisions (v1, v2, v3…) attached to the document header
  • Each revision is drafted, submitted for approval, then published — publishing stamps the effective date
  • Publishing a new revision automatically obsoletes the previous published version
  • Documents can optionally require Read & Understood sign-off from staff audiences
Two-step process

Creating a document only creates the header (name, type, number). Revisions — the actual file content — are added separately from the document detail page. You must create the document first, then open it and add a revision.

Section 02

The document list

2 minutes

Navigate to Quality → Documents to view all controlled documents in your organisation. Each row shows the document number, name, type, the currently published version (or "none published"), total revisions and a View action.

Navigate toQualityDocuments
PrintDownload ExcelSearch records…
NumberNameTypeCurrent VersionRevisionsActions
DOC-2026-0001Goods-in inspection procedureProcedurev22View
DOC-2026-0002M8 Mounting Bracket — Frame A inspection formFormv11View
QP-07Steel Bracket 50mm Offset — material specificationSpecificationnone published1View
Show 10 ▾ · Showing 1–3 of 3
«
1
»
Column What it shows
NumberThe unique document reference — e.g. DOC-2026-0001 (auto-assigned) or a custom code like QP-07. Immutable — never changes once created.
NameThe document title — e.g. Goods-in inspection procedure.
TypeThe document classification — Procedure, Work instruction, Form, Specification, Policy, or Other. Colour-coded for quick scanning.
Current VersionThe latest published revision number — e.g. v2. Shows none published if no revision has been published yet.
RevisionsTotal number of revisions created for this document (including drafts and obsolete versions).
ActionsClick View to open the full document record — see all revisions, signatures, acknowledgements and manage the document.

Section 03

Creating a document

2 minutes

Click + New document (top-right of the Documents page) to open the creation form inline. This step creates the document header only — the name, type and reference number. Actual file content is uploaded as a revision once the document is created and opened.

Navigate toQualityDocuments+ New document

New Document

Creates the document header — add revisions from the detail page

The document number is assigned automatically (DOC-...) if left blank. After creating the document, open it to add and manage versioned revisions.
Goods-in inspection procedure
Procedure
# e.g. QP-07

Auto DOC-… when blank

Field Required What to enter
NameRequiredA clear, descriptive title — e.g. Goods-in inspection procedure, M8 Mounting Bracket inspection form. Use a name that makes the document identifiable without opening it.
TypeOptionalThe document classification. Defaults to Procedure. Select from: Work instruction, Procedure, Form, Specification, Policy, Other. See Section 04 for definitions.
Document NumberOptionalA custom reference code — e.g. QP-07. Leave blank to have Brytebuild assign the next DOC-YYYY-NNNN number automatically. The number is immutable once saved.
Edit is the same form

Clicking Edit Document from the detail footer opens an identical form with the same three fields pre-filled. The document number field becomes read-only (immutable). Make your changes and click Save changes.

Section 04

Document types

1 minute

The Type field classifies the document within your QMS. All six types are controlled identically — the type is a label for searching, filtering and understanding what the document contains:

Procedure

A step-by-step method for performing a process — e.g. Goods-in inspection procedure, NCR handling procedure.

Work instruction

Detailed task-level instructions for a specific operation — e.g. M8 bolt torque instruction, Bracket assembly work instruction.

Form

A template for capturing records — e.g. M8 Mounting Bracket — Frame A inspection form, Supplier evaluation form.

Specification

Technical requirements or standards — e.g. Steel Bracket 50mm Offset material specification, Thread form tolerance spec.

Policy

An organisational commitment or rule — e.g. Quality policy, Supplier approval policy, CAPA response policy.

Other

Any controlled document that does not fit the above categories — plans, registers, reference tables, etc.

Section 05

The document record

2 minutes

Click View on any row in the list to open the full document record. The record has three sections: Document Details, Revisions, and Read & Understood.

Document Details

ISO 7.5 — the document number is immutable

Number

DOC-2026-0001

Name

Goods-in inspection procedure

Type

Procedure

Current Version

None published

Revisions

Each revision is drafted, submitted for approval, then published — publishing stamps the effective date and obsoletes the prior version

Add revision
Version Status Change Summary Effective Date Signatures Actions
v2 file
In reviewUpdated measurement tolerances to reflect Steelco Fasteners Ltd revised spec — Section 4.2Syed Naqeeb ul Haq · AuthoredPublish
v1 file
ObsoleteInitial release2026-06-15Syed Naqeeb ul Haq · Authored
Footer button What it does
Go BackReturns to the document list without any changes.
DeletePermanently removes the document and all its revisions. Use with caution — this cannot be undone.
Edit DocumentOpens the edit form (same as Create) to change the document name or type. The document number is read-only.

Section 06

Adding and managing revisions

3 minutes

From the document detail page click + Add revision to open the new revision (draft) form inline. Every revision requires a version number and optionally a change summary and a file upload. Once saved it appears in the revisions table with a Draft or In review status.

New Revision (Draft)

e.g. 2.0
Updated measurement tolerances — Section 4.2
Browse… goods_in_procedure_v2.pdf
Add revision Cancel
Field Required What to enter
VersionRequiredThe version identifier — e.g. 2.0, v2, 1.1. Any text is accepted; use a consistent numbering convention across your organisation.
Change SummaryOptionalA brief description of what changed in this revision — e.g. Updated measurement tolerances — Section 4.2. Shown in the revisions table and in audit exports.
FileOptionalUpload the document file (PDF, Word, Excel etc.). The linked file icon appears in the Version column. A revision can exist without a file — useful for placeholder drafts.

Revision table columns

Column What it shows
VersionThe revision identifier — e.g. v2. A link icon (🔗) appears when a file has been uploaded.
StatusDraft — just created, not yet submitted. ⏱ In review — submitted for approval, awaiting sign-off. ✓ Published — approved and live. Obsolete — superseded by a newer published version.
Change SummaryThe description entered when the revision was created.
Effective DateThe date the revision was published. Stamped automatically on publish. Blank until published.
SignaturesWho has signed the revision — e.g. Syed Naqeeb ul Haq · Authored. Records the approval trail.
ActionsPublish (green) — available on an In review revision when approvals are complete. Stamps the effective date and obsoletes the previous published version.
Publishing is irreversible

Once a revision is published it is locked — the file, change summary and effective date cannot be edited. Publishing also automatically moves the previous published version to Obsolete status. If you need to correct a published revision, create a new revision with the corrected file.

Section 07

Read & Understood

2 minutes

The Read & Understood section controls whether staff must acknowledge each published revision. When enabled, every person in the audience is prompted to sign that they have read and understood the current version — the response is retained as evidence with the name, date and meaning of the acknowledgement.

Read & Understood

Who has acknowledged the current revision — retained as evidence (name, date, meaning)

No published revision yet — acknowledgements start once the first revision is published.

Audience (no group ticked = every active staff member)

WarehouseProduction schedulingQualityPurchasingManagementSales OrderEngineering
Setting What it does
Require acknowledgementWhen checked, all audience members are prompted to sign read & understood against each published revision. When unchecked, acknowledgements are off and no prompts are sent.
AudienceThe staff groups who will be asked to acknowledge. Leave no groups ticked to require every active staff member. Tick specific groups (e.g. Warehouse, Quality) to limit the audience.
Acknowledgements start on publish

If no revision has been published yet, the acknowledgement panel shows "No published revision yet — acknowledgements start once the first revision is published." Staff are only prompted once a revision is in Published status.

Section 08

Revision lifecycle

1 minute

Every revision moves through a fixed set of statuses from creation to obsolescence:

Status What's happening Next step
DraftRevision created, not yet submitted for review. File can still be replaced.Submit for review / route through approval workflow
⏱ In reviewSubmitted to the approval workflow. Awaiting sign-off in the Approval Inbox.Approver clicks Publish once sign-off is complete
✓ PublishedApproved and live. Effective date stamped. Acknowledgements triggered (if enabled).Stays published until a newer revision is published
ObsoleteSuperseded by a newer published revision. Read-only record preserved for audit.No further action — retained as history

What's next