Quality Beginner

NCRs / Rejects

How to view, create, investigate and close Non-Conformance Reports (NCRs) in Brytebuild — covering severity levels (Minor, Major, Critical), root-cause investigation (ISO 9001 §8.7), CAPA linkage and rejected-stock dispositions.

1 min read All roles Updated August 2026

A Non-Conformance Report (NCR) is a formal record of a quality failure — a product, batch or process that does not meet specification. In Brytebuild, NCRs are:

  • Auto-raised whenever an inspection rejects stock — the system creates the NCR instantly, linking it to the inspection record and the rejected lot.
  • Manually created for failures discovered outside of a formal inspection — customer complaints, supplier issues, process deviations.
Create NCR
Investigate & record actions
Raise CAPA
Close NCR
Navigation

NCRs are reached directly from the Quality section of the left navigation — Quality → NCRs / Rejects. They are also accessible from a rejected inspection record via the inspection log.

Severity levels

Minor

A small deviation with low impact — the product may still be usable. Typical for cosmetic defects or single-unit rejects.

Major

A significant deviation affecting function, safety or compliance. Typically requires corrective action and close-out sign-off.

Critical

A serious failure requiring immediate containment. May trigger a customer notification or regulatory report. Highest priority to close.

Section 02

The NCR list

2 minutes

Navigate to Quality → NCRs / Rejects to see all non-conformance reports across your workspace. The list shows NCRs in reverse creation order — most recent first.

PrintDownload ExcelSearch records…Create NCR
NCR #ProductSeverityQtyStatusAction
NCR-2026-0008M8 Mounting Bracket — Frame AMinor1OpenView
NCR-2026-0007Steel Bracket 50mm OffsetCritical10OpenView
NCR-2026-0006M8 Mounting Bracket — Frame AMinor1OpenView
NCR-2026-0005M8 Mounting Bracket — Frame AMinor1OpenView
NCR-2026-0001Steel Bracket 50mm OffsetMinor10ClosedView
Show10 ▾· Showing 1–5 of 8
«
1
»
Column What it shows
NCR #Auto-generated reference in NCR-YYYY-NNNN format. Click to open the full NCR record.
ProductThe product name of the item that failed. Links to the product record.
SeverityMinor, Major or Critical — set when the NCR is created or edited.
QtyNumber of units affected by this non-conformance.
StatusOpen (active) or Closed (resolved). Changed on the edit page.
ActionClick View to open the full NCR record.

Section 03

Creating an NCR manually

2 minutes

Use the + Create NCR button (top-right of the NCR list) to raise a manual NCR — for failures discovered outside a formal inspection, such as a customer complaint or a supplier quality issue.

Navigate toQualityNCRs / Rejects+ Create NCR

New Non-Conformance Report

Fill in the details below to raise a manual NCR

Minor
Minor
e.g. 10
dd / mm / yyyy
Link a product…
What happens next? After creating this NCR, you'll be taken directly to it to record root cause, corrective and preventive actions before closing it out.
Field Required What to enter
SeverityRequiredSelect Minor, Major or Critical. A preview badge updates as you change the dropdown.
Quantity AffectedRequiredThe number of units involved in this non-conformance.
Due DateOptionalTarget date for closure. Leave blank if no deadline is set.
ProductOptionalLink this NCR to a specific product in your catalogue. Auto-populated when raised from an inspection.
DescriptionRequiredA plain-language description of the non-conformance. Include what failed, where it was found and any immediate impact.
Auto-raised NCRs

When an inspection rejects stock, Brytebuild creates the NCR automatically. The Description is pre-filled with the inspection UUID and rejection reason (e.g. "Auto-raised from inspection 97353eae… 1 of M8 Mounting Bracket — Frame A rejected (damaged).") You don't need to create a manual NCR for these.

Section 04

The NCR record

3 minutes

Clicking View on any NCR opens the full record. The record is read-only — use Edit NCR (bottom-right footer) to make changes.

NCR Details

NCR Number

NCR-2026-0005

Product

M8 Mounting Bracket — Frame A (#MTB-0062)

Lot

Qty Affected

1

Raised

20 Jul 2026

Due

Not set

Raised from Inspection

View Inspection
Status & Severity

Status

Open

Severity

Minor

Description

Auto-raised from inspection 97353eae-4906-4ac9-8c33-a79383398f73. 1 of M8 Mounting Bracket — Frame A (#MTB-0062) rejected (damaged).

Investigation & Actions section

Below the detail panels, the Investigation & Actions section records the formal root cause analysis as required by ISO 9001 §8.7. Fill this in from the edit page.

Investigation & Actions

Root cause + immediate correction; the formal corrective actions are the linked CAPAs below (ISO 9001 §8.7)

Root Cause

Not recorded

Immediate Correction / Containment

Not recorded

Preventive Action (notes)

Not recorded

Closure Notes

Not recorded

Corrective & Preventive Actions (CAPA)

The CAPA section links formal effectiveness-verified actions to this NCR. The NCR cannot be closed until all linked CAPAs are closed (ISO 9001 §10.2). CAPAs are raised from the edit page.

Corrective & Preventive Actions (CAPA)

The formal, effectiveness-verified actions. The NCR can't close until these are closed (§10.2)

None raised yet. Raise one from the edit page.

Attachments & Evidence

Upload images, engineering files and documents as objective evidence for the record (ISO 9001 §7.5). Attachments are added from the edit page.

Rejected Stock

The Rejected Stock table shows every product unit captured by this NCR, the rejection reason, and the disposition applied. The disposition dropdown is set on the edit page.

Rejected Stock

1 rejected item — disposition is set on the edit page

ProductQtyReasonDisposition
M8 Mounting Bracket — Frame A (#MTB-0062)1damagedReturn to Supplier

Section 05

Investigating an NCR

2 minutes

Click Edit NCR from the record view to begin filling in the investigation. The four investigation fields follow the ISO 9001 §8.7 model — capture them as you work through the analysis.

Field What to record
Root CauseWhat caused this non-conformance? Use the 5-Whys or Fishbone approach. Be specific — "operator error" is not a root cause.
Immediate Correction / ContainmentThe fast fix to contain impact — quarantining stock, recalling shipments, adding interim checks (ISO 9001 §8.7). This is distinct from the long-term corrective action.
Preventive Action (notes)What will prevent recurrence? Formalise this as a CAPA using the buttons below so it can be tracked and verified for effectiveness.
Closure NotesSummary notes to record when closing the NCR — confirms the corrective actions were effective and the non-conformance is resolved.
CAPA vs Preventive Action notes

The Preventive Action (notes) field is a free-text scratch pad. For a formal, tracked corrective or preventive action use the + Corrective action / + Preventive action buttons in the CAPA section — these create a linked CAPA record that must be closed before the NCR can close.

Section 06

Editing and closing an NCR

2 minutes

All editable fields on an NCR are accessed from Edit NCR. The edit page is identical in structure to the record view, but every field becomes editable and additional controls appear.

Status & Severity (edit)

Use the Status dropdown to change the NCR state. The severity badge updates live as you change the Severity dropdown.

Status Meaning
Open The NCR is active and unresolved. Default state when created.
Closed All investigation fields are completed, all CAPAs are closed, and the non-conformance is resolved. Set this manually once you are satisfied.
Cannot close with open CAPAs

If you have raised a Corrective or Preventive Action against this NCR, all linked CAPAs must be closed before the NCR status can be set to Closed. Close them in the CAPA module first.

Rejected Stock — Dispositions

Each rejected unit in the Rejected Stock table has a Disposition dropdown. Set this to tell the system what should happen to the non-conforming material.

Return to Supplier

Send the rejected units back to the supplier for credit or replacement. Use when the root cause is a supplier defect.

Scrap

Write the units off — they will be removed from inventory. Use for damaged goods with no salvage value.

Rework

Send the units back through production for correction. Creates or links to a rework work order.

Accept as-is

Release the stock despite the non-conformance — typically a concession signed off by the customer or quality manager.

What's next