Purchasing Beginner

Product economics — prices, cost by batch, sales plans and break-even

Prices by channel with VAT both ways and margin checks; what a unit costs at each batch size; sales plans by scenario that feed MRP before launch; and break-even, peak cash and payback — all from live data.

5 min read Owner, Engineering, Sales Updated November 2026

Everything a product earns and costs, in one place and worked out from your live prices, supplier offers and BOM — not copied into a spreadsheet that goes stale. Prices by channel are in every plan; cost by batch size, sales plans and break-even are part of Pro. Every number can carry where it came from and whether it is an owner decision, sourced, or an estimate; estimates are shown as such everywhere.

Section 01

Prices by channel

2 minutes

Navigate toSalesPrice lists

A price list now has a channel (retail / web, trade, partner), a status — draft (proposed, not in force), active, archived (superseded, kept as history) — and can hold prices including VAT, the way a retail price is quoted. Order lines are always priced without VAT: a VAT-inclusive list price has VAT taken off at the product's rate, and the line says so. If your company isn't VAT-registered (Settings → Tax), the inclusive price is used as it is.

CheckWhat it does
Reseller keepsOn a trade list, pick the retail list to compare with and the least the reseller must keep per unit. Every product on both lists is checked: retail ex VAT − trade price.
Bundle ≤ partsOn a product's Prices tab, name the products it must not cost more than together. Checked on every list where all of them have a price.

The product's Prices tab shows its price on every list, with and without VAT, where each came from, and the checks.

Section 02

Cost by batch size

2 minutes

Navigate toProductsa productEconomics

Add the batch sizes you plan to build at — 10, 25, 50, 100. For each, Recalculate works out the cost of one unit: material at the price break that batch reaches from the supplier chosen for this product (else the part's preferred supplier, else its own cost), with minimum orders and packs; labour from the route with setup spread over the batch, or minutes and a rate you enter; landed cost (freight and fees per batch, duty %); VAT on purchases when you aren't VAT-registered; and a rework allowance. The star makes one row the product's standard cost, recorded in its cost history.

Selling costs — delivery, box, card or bank fee, point of sale, warranty reserve — sit below, per channel, as an amount per unit or a % of the price. They are a cost of the sale, so they are kept out of the build cost.

Section 03

Sales plans

2 minutes

Navigate toPlanningSales plans

A plan is a scenario — low, base, high, or a named case. Fill a product's months from a short description: units per year (spread evenly), units per month, or outlets × units per outlet with outlets at each year end (rising month by month) and a factor per year for a pilot. Accessories and spares follow their main product: a % of its sales, or one every N months per unit in use. The plan marked used for planning feeds MRP for products with no sales history yet (with include forecast switched on), so parts are ordered ahead of a launch. Lifecycle dates and go / stop gates with their criteria sit on the product's Economics tab.

Section 04

Break-even and cash

3 minutes

Enter the product's one-off and fixed costs — prototypes, lab days, approvals, tooling, trademark, yearly overheads — with a low / base / high figure; costs not tied to one product go on the Sales plans page and are shared by planned units. Founders' unpaid time can be recorded as not cash. The Economics tab then shows, for every plan side by side:

FigureHow it is worked out
Contribution per unitPer channel: the in-force price on that channel's list (net of VAT when registered) − the cost per unit − selling costs.
Break-even units and monthFixed costs ÷ average contribution; and the month cumulative contribution first covers cumulative fixed costs.
Peak cash neededThe lowest point of cumulative cash: stock bought a batch at a time ahead of sales, retail paid on sale, trade after your payment terms, fixed costs when they fall. Shown against the product's investment cap.
Profit per year, paybackContribution less fixed costs by year (unpaid time alongside); units needed to pay back the one-off development spend.
Nothing is typed twice

Change a supplier quote, a price, a batch size or a plan and the break-even moves with it. The only things stored are the inputs and their sources.

What's next