Running your week: daily, weekly and monthly habits
The routine that keeps your data true - what to do each day, week and month, and who owns each part.
A system is only as true as the habits around it. This is the rhythm that keeps the numbers worth reading — what happens daily, weekly and monthly, and who owns each part. Adapt the roles to your shop; the cadence is the part that matters.
Part 01
Every day
2 minutes
Record movements immediately — everyone. Goods in when the van leaves, material issued when it is taken, output when the job is done, despatch when it ships. Not at the end of the day from memory. This is the whole foundation, and it is the one habit that cannot be delegated to a weekly catch-up.
| Habit | How often | Who owns it |
|---|---|---|
| Record stock movements as they happen | Continuously | Everyone who touches material |
| Clear the shortage list | Daily | Whoever owns purchasing |
| Log issues against the job | Daily | Shop floor |
| Run planning and read the gap | Weekly | Production lead |
| Check capacity against the order book | Weekly | Production lead |
| Count a handful of fast-moving locations | Weekly | Warehouse |
| Invoice what shipped | Weekly | Whoever owns invoicing |
| Job costs against quotes | Monthly | Owner or manager |
| Review scrap and issue patterns | Monthly | Quality or owner |
| Chase overdue receivables | Monthly | Whoever owns invoicing |
| Correct the BOMs the month disproved | Monthly | Engineering or production lead |
Clear the shortage list — whoever owns purchasing. A short job found today is a phone call. Found on the morning of the build, it is a late delivery. Five minutes on this is the highest-value five minutes in the day.
Log issues where they happened — the shop floor. A scrapped part, a wrong dimension, a tool that failed. Logged against the job while the detail is fresh, this becomes evidence. Remembered later, it becomes an argument.
Part 02
Every week
2 minutes
Run planning and look at what it recommends — production lead. The point is not to accept every suggestion. It is to see the gap between what is promised and what is possible while there is still a week to act on it.
Check capacity against the order book. Not "are we busy" but "is any work centre committed beyond what it can do". Overload found a week out gets solved with overtime or a conversation. Found on the day, it gets solved by disappointing somebody.
Count a handful of locations — warehouse. Not a full stock take. A rolling handful, chosen from your fastest-moving parts. This is how you find out that discipline has slipped, four weeks before it would have shown up as a mystery shortage.
Invoice what shipped. A week is the longest this should ever wait. It is also the cheapest cash-flow improvement available to most small manufacturers.
Part 03
Every month
2 minutes
Look at job costs against quotes — owner or manager. Which jobs made money and which did not. This is the report that changes what you quote, and the one most likely to be skipped because nothing breaks if you do.
Review what got scrapped and why. One month of issues is noise; three months is a pattern. Patterns point at a supplier, a machine, a drawing or a training gap.
Chase receivables properly. Work through what is overdue rather than reacting to whoever shouts.
Fix the BOMs the month proved wrong. Every month of real building surfaces recipes that are subtly off. Correcting them as you go is the difference between a system that gets more accurate over time and one that decays.
Part 04
On ownership
1 minute
Every habit above needs a name against it. "The team" owning stock accuracy means nobody owns it. The specific failure mode is quiet: nothing breaks for weeks, then availability is wrong, and by then the cause is a hundred small unrecorded movements that cannot be reconstructed.
If you are small enough that one person owns most of this, write it down anyway. The list is what you hand over when you hire.
An unowned habit does not happen. "The team" owning stock accuracy means nobody owns it, and the failure is quiet - nothing breaks for weeks, then availability is wrong and the cause cannot be reconstructed.