Production Beginner

Create a work instruction

5-step wizard covering General, BOM, Images, Assets and StepFlow — including the Assembly vs Item BOM logic.

1 min read Managers & Admins Updated August 2026

Before you start

How to access the wizard

1 minute

From the left sidebar, navigate to Production → Work Instructions, then click Add Work Instructions. This opens the 5-step creation wizard.

Navigate toProductionWork InstructionsAdd Work Instructions
General
BOM
Images
Assets
StepFlow

The top header card always shows the current step number and the active step name. You can navigate back with ← Go Back at any time without losing data.

Step 1 of 5

General

3 minutes

Step 1 covers the core identity of the work instruction. Only Name, Description and Type are required — Version and Linked Item are optional.

Work Instruction Details

Work Instruction Details

Name, description and version for this work instruction

Name of Work Instructions*
Name of Work Instructions
Description*
Description
Version
Version
Type*
Select type…
Field Required What to enter
Name of Work Instructions Yes A clear name for this guide, e.g. "CNC Machining — Part A" or "Assembly Line 3 — Subframe Build". Operators see this name on the shop floor.
Description Yes A short summary of what this work instruction covers. Shown in the work instruction list and on the detail page.
Version No An optional version number — e.g. 1, 2.1, v3. Useful when you update a guide and want to track which revision operators are following.
Type Yes The category of work this instruction describes. Select from the 10 available types listed below.

Type options

Choose the type that best describes the category of work this instruction covers. The type helps filter and organise work instructions in the list view.

Training
Development
Building
QC
Packaging
Testing
Assembly
Repair
R&D
Setting up

Linked Item

You can optionally link this work instruction to a specific product or assembly in your item catalogue. Linking means when this work instruction is attached to a work order, the BOM step automatically shows the relevant components for that product.

Linking is optional

You don't have to link this work instruction to an item. Unlinked instructions (e.g. Training, R&D, Setting up types) work perfectly without a linked product. If you do link an item, it affects what appears in the BOM step — see Step 2 for the full logic.

Click Show Item Catalogue to browse your products and assemblies. Tick the checkbox on any row to link that item to this work instruction.

Hide Item Catalogue
Number
Item Name
Item Type
Total Stock
Item Unit
Status
Choose
456
040424
Item
▼ 7 ea
Each
ACTIVE
32
061123
Item
▲ 26 ea
Each
ACTIVE
061223
061223
Assembly
▼ 2 ea
Each
ACTIVE
Column What it shows
NumberYour internal product number / SKU.
Item NameThe product name as set in your catalogue.
Item TypeItem (a single product) or Assembly (a product with a Bill of Materials). This determines what the BOM step shows in Step 2.
Total StockCurrent stock level with a ▲ (surplus) or ▼ (deficit) indicator relative to expected levels.
Item UnitUnit of measure — editable inline via dropdown.
StatusACTIVE means the product is live and available. Inactive items can still be linked but won't appear in new work orders.
Choose ItemTick the checkbox to link this item to the work instruction. Only one item can be linked at a time.
Fill in the details above, then click Next Step to continue.
← Go BackNext Step →

Step 2 of 5

BOM

3 minutes

Step 2 lets you build the Bill of Materials for this work instruction — the list of component parts operators will need. What you see on this step depends on the type of item you linked in Step 1.

Assembly vs Item — what changes

Assembly Linked item is an Assembly

The BOM step shows the Item Catalogue with a radio filter toggle — All Items (shows every product) or BOM Items (shows only the components already on this assembly's BOM). You can tick items to add them to this work instruction's BOM, set a quantity for each, and see everything you've added in the Current BOM Items table below.

Item Linked item is a plain Item — or no item linked

The BOM step shows only the All Items view — no BOM Items filter, because plain items don't have a BOM. You can still add components manually by ticking items and setting quantities, building a BOM from scratch.

Item Catalogue (top table)

Item Catalogue

Browse and select component parts to add to this work instruction's BOM

All Items BOM Items
Number Item Name Type Status Stock BOM Qty Quantity Unit Action
323 Austin Martin Item ACTIVE 0 ea132
Qty
Each

Current BOM Items

Items currently added to this work instruction's bill of materials

Number Item Name Type Status Stock Quantity Unit Action
No items added yet — tick items in the catalogue above to add them here
Column What it shows / does
NumberProduct number / SKU.
Item NameProduct name.
Item TypeItem or Assembly.
StatusACTIVE or INACTIVE.
Total StockCurrent stock level.
Item Qty in BOMOnly shown when the BOM Items filter is active on an Assembly-linked instruction. Shows how many of this component are on the assembly's existing BOM.
QuantityHow many of this component are needed per production run. Enter the number before ticking the checkbox.
UnitUnit of measure for this component — editable inline.
Action (checkbox)Tick to add this item to the Current BOM Items table below. It appears immediately once ticked.
BOM is optional

You don't have to add any BOM items. Training, R&D, Setting up and many other work instruction types don't need a BOM. Click Next Step to skip this step if not applicable.

✕ Cancel
← Previous StepNext Step →

Step 3 of 5

Images

1 minute

Upload reference images and diagrams that operators can view while following this work instruction. Images are shown inline on the work instruction detail page and during StepFlow execution.

Upload Images

Drag and drop or click to browse — JPEG, JPG, PNG, WEBP · Max 10 MB

Drag 'n' drop some files here, or click to select files

JPEG, JPG, PNG, WEBP · max 10 MB per image

Detail
Accepted formatsJPEG, JPG, PNG, WEBP
Max file size10 MB per image
Primary imageAfter uploading, mark one image as Primary. This becomes the cover image shown in the work instruction list and on the detail page. If no Primary is set, the first image uploaded is used.
Multiple imagesYou can upload as many images as needed. Operators can swipe through them during StepFlow. Upload diagrams, photos of the finished part, safety notices — anything visual that helps.
Step is optionalImages are not required. Click Next Step to skip if no images are needed for this instruction.
Images vs Assets

Images go here (Step 3). Documents, data sheets, spreadsheets and videos go in Assets (Step 4). Keep them separate — images are displayed inline, assets are downloadable attachments.

✕ Cancel
← Previous StepNext Step →

Step 4 of 5

Assets

1 minute

Assets are supporting files operators can download while following this instruction — data sheets, engineering drawings, spreadsheets, videos and more. This is the last step before saving.

Upload Assets

Click to browse or drag and drop — PDF, DOCX, XLSX, ZIP, MP4 and more · Max 50 MB

Drag 'n' drop some files here, or click to select files

PDF, DOCX, XLSX, PPTX, CSV, ZIP, MP4, MP3 · max 50 MB · no images

Detail
Accepted formatsPDF, DOCX, XLSX, PPTX, CSV, ZIP, MP4, MP3 — and other document/media formats. Images are not accepted here — use Step 3 for images.
Max file size50 MB per file (five times larger than the image limit).
Multiple assetsUpload as many files as needed. Operators can download any asset while following the instruction on the shop floor.
Step is optionalAssets are not required. If you have no supporting documents, click Save Work Instructions to publish.
Saving publishes the work instruction

Clicking Save Work Instructions at the end of Step 4 creates the work instruction and makes it available to attach to work orders. The next screen (Step 5) confirms the save and offers two next steps: jump straight into the StepFlow editor to define the operator steps, or go to the detail page.

✕ Cancel
← Previous StepSave Work Instructions ✓

Step 5 of 5

StepFlow — confirmation & next steps

2 minutes

General
BOM
Images
Assets
StepFlow

Work Instruction Created!

The work instruction has been successfully saved. Select an option below to continue.

Work Instruction saved Ready for StepFlow

What would you like to do next?

Create Steps

Open the StepFlow editor to define the step-by-step operator flow

View Work Instructions

Open the detail page for this work instruction

If you're not ready to do either, click Exit in the footer bar to return to the Work Instructions list. You can always come back to create steps or view the instruction later.

↩ Exit
Create Steps →View Work Instructions →

What to do next