Features Industries Compare Case Study Docs Pricing Contact Us
Sign in Start Free Trial
Food & Drink Production

MRP software for Food & Drink Production

Food production lives and dies on traceability and shelf life. Brytebuild captures the supplier batch and expiry at the door, rotates stock by expiry, and can reconstruct where a batch went.

14-day free trial No credit card needed Built for UK manufacturers

What gets in the way in Food & Drink Production

These are the problems we hear most often from workshops of this kind, and what Brytebuild does about each one.

The problem How Brytebuild handles it
A recall means checking everything Every batch is traced forward to the customers who received it and backward to the raw materials that went in.
Stock is picked in the wrong order FEFO picking suggests the earliest-expiring stock first, so short-life goods move before they lapse.
Expiry is discovered too late An expiry register surfaces what is near date while there is still time to sell or use it.
Audit preparation eats a week Inspections, non-conformances and corrective actions are recorded as work happens, not assembled afterwards.

How a job actually runs

Everything in food production hangs off batch identity and dates. This is where both are captured, and what they make possible later.

Pallet at the door CAPTURED AT GOODS-IN Lot B-4471 Expiry 15 Aug before put-away
1

Raw materials in

The supplier lot and expiry are captured at goods-in, before the pallet is put away. Shelf life is recorded against that specific delivery rather than against the product in general, which is the difference between being able to run FEFO and only being able to describe it.

WORKS ORDER · 400 units Base syrup in stock Citric acid in stock Bottles 500ml short 120 MRP raises the purchase order
2

The batch is planned

A works order is raised against the recipe, and MRP nets what the run needs against what you hold and what is already on order.

PICK THIS ONE Lot B-4471 · 240 units exp 15 Aug Lot B-4488 · 180 units exp 02 Sep Lot B-4502 · 300 units exp 20 Nov
3

Picking by date, not by shelf position

The earliest-expiring lot is suggested first, so short-dated stock moves while it still has value instead of being found at the back of the chiller a week late.

INSPECTION PLAN v3 Brix 11.2 pH 3.4 Seal integrity recorded as it happens QUARANTINE not onward
4

Make and check

Inspections run against a versioned plan at the stage they belong to. Anything that fails goes to quarantine rather than onward, and the hold is a record rather than a note on a pallet.

Sparkling Elderflower 500ml · 24 per case BATCH B-4471
5

Pack, label, despatch

The finished batch carries its own identity, and the despatch record links it to the customer who received it.

BATCH B-4471 Cust. 1042 Cust. 1051 Cust. 1063 3 CUSTOMERS in one query
6

When a supplier calls

One query returns every finished batch containing their material and every customer who took it. That is the moment the whole system either pays for itself or does not.

What you get

  • Supplier lot and expiry captured at goods-in
  • FEFO picking and an expiry register
  • Full forward and backward batch traceability
  • Quality inspections, NCRs and CAPA
  • Barcode-driven stock control

Brytebuild supports the records a quality standard asks for: traceability, inspections, non-conformances and document control. It does not certify you. The audit is still yours to pass, and we would rather say so than imply otherwise.

Is it a fit?

The honest answer is that it depends on how you work. Look at the full feature list and pricing, or see how we compare to Katana. If you would rather just ask, get in touch, and we will tell you if we are not the right fit.

See It On Your Own
Products And Orders.

Fourteen days, your real data, no card. The fastest way to know whether Brytebuild fits your factory is to put a week of work through it.

No credit card
14-day free trial
No lock-in contracts
UK support